permit
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| permit [2026/06/26 23:34] – tony | permit [2026/06/27 00:19] (current) – tony | ||
|---|---|---|---|
| Line 5: | Line 5: | ||
| * Can we connect with a " | * Can we connect with a " | ||
| * Is there a website to see approximate costs of permits for different project classifications. | * Is there a website to see approximate costs of permits for different project classifications. | ||
| - | * We have a 15' setback from the street. Can we put a covered porch in that area? Where does that 15' setback start? Is it foundation, is it the roof overhang, is etc etc etc? | + | * We have a 15' setback from the street. Can we put a covered porch in that area? Where does that 15' setback start? Is it foundation, is it the roof overhang, is etc etc etc? |
| - | * | + | * Can we pull our foundation back to avoid the roots of the oak tree, then cantilever over so our house doesn' |
| + | * Does the old house need it's own electrical service? | ||
| Line 12: | Line 13: | ||
| ---- | ---- | ||
| + | https:// | ||
| https:// | https:// | ||
permit.1782516850.txt.gz · Last modified: by tony
