permit
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| permit [2026/06/27 00:13] – tony | permit [2026/06/27 00:19] (current) – tony | ||
|---|---|---|---|
| Line 7: | Line 7: | ||
| * We have a 15' setback from the street. Can we put a covered porch in that area? Where does that 15' setback start? Is it foundation, is it the roof overhang, is etc etc etc? | * We have a 15' setback from the street. Can we put a covered porch in that area? Where does that 15' setback start? Is it foundation, is it the roof overhang, is etc etc etc? | ||
| * Can we pull our foundation back to avoid the roots of the oak tree, then cantilever over so our house doesn' | * Can we pull our foundation back to avoid the roots of the oak tree, then cantilever over so our house doesn' | ||
| + | * Does the old house need it's own electrical service? | ||
permit.1782519213.txt.gz · Last modified: by tony
