timeline
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| timeline [2026/06/01 20:42] – tony | timeline [2026/06/01 21:15] (current) – tony | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====2026==== | ====2026==== | ||
| - | Get a survey done. Aline is owning. | + | Get a survey done. -A |
| Investigate our water line. | Investigate our water line. | ||
| - | Do a shitty survey so we can come up with a house plan. | + | Do a shitty survey so we can come up with a house plan. -T |
| - | Come up with 2 or 3 house plans to give to a designer. | + | Come up with 2 or 3 house plans to give to a designer. |
| + | |||
| + | Find a foundation company. -T | ||
| Get all the [[permits]] in order | Get all the [[permits]] in order | ||
timeline.txt · Last modified: by tony
