timeline [2026/11/28 00:42] – alinetimeline [2026/11/28 01:20] (current) – aline
Line 4: Line 4:
 1. Get an existing conditions survey done. Tony is working on this. 1. Get an existing conditions survey done. Tony is working on this.
 2. Tony - start gantt chart, link to it from TonyDiethelm website, start building a project schedule 2. Tony - start gantt chart, link to it from TonyDiethelm website, start building a project schedule
 +3. Ask engineer: can we get rid of old cedar roof and build a "deck roof"?
 +"call" 811 
 +4. Look over Jan's latest designs and tell her what we like and what we don't like.
 +
 +Which permit are we trying to get? Addition? New construction? Duplex?
 +Tony needs to have another meeting with city: what are the implications of doing an addition compared to new construction? Tell city what we are doing. Learn which permit we need to apply for?
 +(Jake thinks our plans might end up being treated at duplex).
  
 **Jake:** **Jake:**
 +1. what makes a legal bedroom in portland oregon? Does it have to have a built in closet?
  
  
Line 17: Line 25:
 5. make 2 designs, something with stairs in  both locations  5. make 2 designs, something with stairs in  both locations 
 6. figure out how small my office can be, do I have closet/storage in the office? yes I do. 6. figure out how small my office can be, do I have closet/storage in the office? yes I do.
-ks for Jan to do:**+7. Ask engineer: can we get rid of old cedar roof and build a "deck roof"? 
 +8. Look over Jan's latest designs and tell her what we like and don't like. 
 +9. Is tony's floor ADA/wheelchair accessible everywhere?
  
 **Jan:** **Jan:**
Line 25: Line 35:
  
  
-"call" 811  
  
-Which permit are we trying to get? Addition? New construction? Duplex? 
-Tony needs to have another meeting with city: what are the implications of doing an addition compared to new construction? Tell city what we are doing. Learn which permit we need to apply for? 
-(Jake thinks our plans might end up being treated at duplex). 
  
 --------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------
Line 80: Line 86:
  
 Do we need a temporary power pole?  Do we need a temporary power pole? 
--------------------------------------------------------------------------------------------- 
-====2027==== 
  
 bottom plates bottom plates