| **December 2026** | **December 2026** | ||
| + | |||
| **Tony:** | **Tony:** | ||
| - | 1. look over Jan's latest designs and tell her what you like and don't like. | + | 1. Get an existing conditions survey done. Tony is working on this. // |
| - | 2. ask engineer | + | |
| - | + | 3. Ask engineer: can we get rid of old cedar roof and build a “deck | |
| - | + | Which permit are we trying to get? Addition? New construction? | |
| - | **Aline: | + | |
| - | 1. photos of house including | + | |
| - | 2. look over Jan's latest designs and tell her what we like and what we don't like. | + | |
| - | 3. design | + | |
| - | 4. design a bathroom. | + | |
| **Jake:** | **Jake:** | ||
| + | 1. what makes a legal bedroom in portland oregon? Does it have to have a built in closet? | ||
| + | **Aline:** 1. send Jan photos of all side of house (make sure includes roof lines & rise to run of all roof slopes) 2. measure and confirm the exact dimensions of old cedar house (including all rooms) 3. Nov and Dec: design a bathroom | ||
| + | • ideal bathroom | ||
| + | • make bathroom I could live with | ||
| + | 4. pick a tub and measure 5. make 2 designs, something with stairs in both locations 6. figure out how small my office can be, do I have closet/ | ||
| **Jan:** | **Jan:** | ||
| - | 1. keep helping | + | 1. Provide drawings for the design of the house. 2. Keep helping with floor plan designs |
| - | -------------------------------------------------------------------------------------------------- | + | |
| + | ----------------------------------------------------------------------------------------------------- | ||
| **January 2027** | **January 2027** | ||
| + | |||
| + | **Tony: | ||
| + | |||
| + | **Jake:** 1. Check our work periodically. 2. Meet with us and check in on project going forward. | ||
| + | |||
| + | **Aline: | ||
| + | |||
| + | **Jan:** | ||
| + | |||
| + | ---------------------------------------------------------------------------------------------- | ||
| + | **February 2027** | ||
| + | Shop around for an engineer. They will need to look over Jan's plans. | ||
| + | Investigate our gas line, and come up with a plan for cedar house if we have no gas. | ||
| + | Find a foundation company that is run by women or people of color. -Tony and Jake | ||
| + | Finalize drawings to submit for the permits. | ||
| + | Get all the permits in order | ||
| + | Dig a big ass hole. | ||
| + | |||
| + | ----------------------------------------------------------------------------------------------- | ||
| + | **March 2027 and Beyond** | ||
| + | |||
| + | Get the exit plumbing fixed | ||
| + | put in the foundation | ||
| + | Tap off water line? | ||
| + | Do we need a temporary power pole? | ||
| + | bottom plates | ||
| + | floor joists | ||
| + | subfloor | ||
| + | 1st story framing | ||
| + | Temporary electrical connection? | ||