timeline_and_todos
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| timeline_and_todos [2026/11/28 02:25] – aline | timeline_and_todos [2026/11/28 02:50] (current) – aline | ||
|---|---|---|---|
| Line 19: | Line 19: | ||
| ----------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------- | ||
| - | January 2027 | + | **January 2027** |
| - | Tony: | + | |
| - | Jake: 1. Check our work periodically. 2. Meet with us and check in on project going forward. | + | **Tony:** |
| - | Aline: | + | |
| - | Jan: | + | |
| - | February 2027 | + | **Jake:** 1. Check our work periodically. 2. Meet with us and check in on project going forward. |
| + | |||
| + | **Aline:** | ||
| + | |||
| + | **Jan:** | ||
| + | |||
| + | ---------------------------------------------------------------------------------------------- | ||
| + | **February 2027** | ||
| Shop around for an engineer. They will need to look over Jan's plans. | Shop around for an engineer. They will need to look over Jan's plans. | ||
| Investigate our gas line, and come up with a plan for cedar house if we have no gas. | Investigate our gas line, and come up with a plan for cedar house if we have no gas. | ||
| Line 33: | Line 38: | ||
| Dig a big ass hole. | Dig a big ass hole. | ||
| - | March 2027 and Beyond | + | ----------------------------------------------------------------------------------------------- |
| + | **March 2027 and Beyond** | ||
| + | |||
| Get the exit plumbing fixed | Get the exit plumbing fixed | ||
| put in the foundation | put in the foundation | ||
timeline_and_todos.1795832720.txt.gz · Last modified: by aline
