Questions for the permitting people
Here's a link for 15 min question appointments.
Current Questions:
- We have a 15' setback from the street. Can we put a covered porch in that area? Where does that 15' setback start? Is it foundation, is it the roof overhang, is etc etc etc?
- Do we need a front door?
What we need
https://www.portland.gov/sites/default/files/code/110-sd-zone_3.pdf ←- Building code for single family dwellings.
https://www.portland.gov/ppd/documents/plans-you-need-building-permit-brochure-6/download
https://www.portland.gov/ppd/how-fill-out-building-permit-application-form
We need:
- site plan
- floor plans and foundation plans
- cross section plans
- building elevation drawings
- See the brochure above.
Sample Plans!
Old Questions, answered
- We CAN connect an expansion through a breezeway.
- Fire setback counts every little extension. roofline, awning, deck, etc.
- We CAN pull our foundation back and cantilever over it to avoid the tree zone, but the cantilever requires engineering checks. Which is money.
- We do NOT require separate water/power/sewer unless it is two buildings. What makes it two buildings? two ranges with a door inbetween.
- Site survey just needs to be accurate, doesn't need certified people to stamp it.
- Don't need engineered drawings if we follow their seismic stuff.