2026
Get a survey done. Aline is owning.
Investigate our water line.
Do a shitty survey so we can come up with a house plan.
Come up with 2 or 3 house plans to give to a designer.
Get all the permits in order
Dig a big ass hole.
Get the exit plumbing fixed
put in the foundation
Tap off water line?
Do we need a temporary power pole?
2027
bottom plates
floor joists
subfloor
1st story framing
Temporary electrical connection?