2026
Get a survey done. Tony is working on this.
Tasks for Jan to do: 1. Provide drawings for the design of the house.
Tasks for Jake to do: 1. Check our work periodically. 2. Meet with us and check in on project going forward.
Investigate our water line.
Investigate our gas line, and come up with a plan for cedar house if we have no gas.
Do a shitty survey so we can come up with a house plan. -T
Find a foundation company. -T
Get all the permits in order
Dig a big ass hole.
Get the exit plumbing fixed
put in the foundation
Tap off water line?
Do we need a temporary power pole?
2027
bottom plates
floor joists
subfloor
1st story framing
Temporary electrical connection?