2026

Get a survey done. Tony is working on this.

Tasks for Jan to do: 1. Provide drawings for the design of the house.

Tasks for Jake to do: 1. Check our work periodically. 2. Meet with us and check in on project going forward.

Investigate our water line.

Investigate our gas line, and come up with a plan for cedar house if we have no gas.

Do a shitty survey so we can come up with a house plan. -T

Find a foundation company. -T

Get all the permits in order

Dig a big ass hole.

Get the exit plumbing fixed

put in the foundation

Tap off water line?

Do we need a temporary power pole?

2027

bottom plates

floor joists

subfloor

1st story framing

Temporary electrical connection?