2026

Get an existing conditions survey done. Tony is working on this.

“call” 811

Which permit are we trying to get? Addition? New construction? Cottage cluster? Duplex? Tony needs to have another meeting with city: what are the implications of doing an addition compared to new construction? Tell city what we are doing. Learn which permit we need to apply for? (Jake thinks our plans might end up being treated at duplex) Tasks for Jan to do: 1. Provide drawings for the design of the house.

Tasks for Jake to do: 1. Check our work periodically. 2. Meet with us and check in on project going forward.

Tony - make gant chart, link to it from TonyDiethelm website.

Investigate our gas line, and come up with a plan for cedar house if we have no gas.

Do a shitty survey so we can come up with a house plan. -T

Find a foundation company. -T

Finalize drawings to submit for the permits.

Get all the permits in order

Dig a big ass hole.

Get the exit plumbing fixed

put in the foundation

Tap off water line?

Do we need a temporary power pole?

2027

bottom plates

floor joists

subfloor

1st story framing

Temporary electrical connection?