December 2026

Tony: 1. Get an existing conditions survey done. Tony is working on this. // 2. Tony - start gantt chart, link to it from TonyDiethelm website, start building a project schedule // 3. Ask engineer: can we get rid of old cedar roof and build a “deck roof”? “call” 811 4. Look over Jan's latest designs and tell her what we like and what we don't like. Which permit are we trying to get? Addition? New construction? Duplex? Tony needs to have another meeting with city: what are the implications of doing an addition compared to new construction? Tell city what we are doing. Learn which permit we need to apply for? (Jake thinks our plans might end up being treated at duplex).

Jake: 1. what makes a legal bedroom in portland oregon? Does it have to have a built in closet? //

Aline: 1. send Jan photos of all side of house (make sure includes roof lines & rise to run of all roof slopes) 2. measure and confirm the exact dimensions of old cedar house (including all rooms) 3. Nov and Dec: design a bathroom

  • ideal bathroom
  • make bathroom I could live with

4. pick a tub and measure 5. make 2 designs, something with stairs in both locations 6. figure out how small my office can be, do I have closet/storage in the office? yes I do. 7. Ask engineer: can we get rid of old cedar roof and build a “deck roof”? 8. Look over Jan's latest designs and tell her what we like and don't like. 9. Is tony's floor ADA/wheelchair accessible everywhere?

Jan: 1. Provide drawings for the design of the house. 2. Keep helping with floor plan designs


January 2027 Tony: Jake: 1. Check our work periodically. 2. Meet with us and check in on project going forward. Aline: Jan:


February 2027 Shop around for an engineer. They will need to look over Jan's plans. Investigate our gas line, and come up with a plan for cedar house if we have no gas. Find a foundation company that is run by women or people of color. -Tony and Jake Finalize drawings to submit for the permits. Get all the permits in order Dig a big ass hole.


March 2027 and Beyond

Get the exit plumbing fixed put in the foundation Tap off water line? Do we need a temporary power pole? bottom plates floor joists subfloor 1st story framing Temporary electrical connection?